nettenasos THE ASHGABAT TIMES

12 New Wells Drilled at the Goturdepe Field in Turkmenistan

10.01.2025

In 2024, specialists from the state concern “Turkmennebit” successfully completed the drilling of 12 new wells at the Goturdepe field, 9 of which are operational and actively extracting hydrocarbon raw materials. This was reported by the newspaper “Turkmenistan.”

The total depth of the drilled rock formations for the production year exceeded the planned target. Of this volume, more than 47.5 thousand meters were drilled for operational purposes.

The company’s drillers plan to explore new depths from the beginning of this year to expand available reserves. Currently, active work is being carried out on 6 wells at the “Northern Goturdepe” field and two wells at the “Uzynada” field.

Leave a Reply

Your email address will not be published.

loader-image
Ashgabat
11:48 pm, Jan 10, 2025
temperature icon 2°C
ясно
Humidity 87 %
Pressure 1028 mb
Wind 5 mph
Wind Gust Wind Gust: 0 mph
Clouds Clouds: 0%
Visibility Visibility: 0 km
Sunrise Sunrise: 8:22 am
Sunset Sunset: 6:05 pm
posol japonii THE ASHGABAT TIMES
Previous Story

The Number of People Learning Japanese in Turkmenistan Has Increased

vladimir mkrtumov THE ASHGABAT TIMES
Next Story

“Winter Tale” Concert to be Held in Ashgabat on January 12

Latest from News

Go toTop