«Tesla» is planning to build a large-scale solar panel manufacturing facility in the U.S. state of Texas. According to «TechCrunch», the cost of the major industrial project, which is expected to be located southwest of Houston, could reach $10.1 billion.
As part of the project called «Project Crystal Sun», the company has submitted relevant documents to state authorities in order to receive tax incentives. According to «Tesla» representatives, if such incentives are not granted, the project’s tax obligations over a 37-year period could amount to approximately $1.1 billion.
At present, «Tesla» management is also considering alternative locations in other U.S. states for the construction of the facility. However, the Texas site remains one of the main options under consideration.
The new facility is expected to make a significant contribution to the regional economy. According to submitted documents, the project could create around 9,700 permanent jobs.
Construction is planned to begin this year, with completion expected by 2028. The first solar panels are expected to roll off the production line in 2029, which would significantly increase manufacturing capacity in the renewable energy sector.
In the submitted documents, the company did not specify whether the solar panels produced at the facility would be intended for ground-based energy systems or space-related projects. However, it is well known that «Tesla» CEO Elon Musk has shown strong interest in developing space technologies and related infrastructure.
The annual production capacity of the future factory has not yet been officially disclosed. Nevertheless, «Tesla» aims to reach 100 gigawatts of manufacturing capacity within the United States by 2028. The new project demonstrates that the company is expanding its strategy beyond electric vehicles and strengthening its position in the renewable energy sector.
«THE ASHGABAT TIMES».